Inspection
Crane Boom
MAIN BOOM INSPECTION & MAINTENANCE PROCEDURE
Task
Action
• Broken wire rope or cut strands.
Replace
• Corrosion of wire rope.
Replace
• Wire rope kinking, crushing, un-stranding, bird caging, main strand
displacement or core protrusion.
Replace
DAILY
• Check the sheaves for wear.
• Check pins for cracks.
• Lubricate the wire ropes.
• Clean the wire ropes.
EVERY 50 HOURS
• Lubricate the hook block.
EVERY 250 HOURS
• Lubricate the slides.
• Lubricate the main boom head.
• Lubricate sliding surfaces.
EVERY 1000 HOURS
• Check the sheaves roller bearings or bushings and are properly
lubricated.
EVERY 1500 HOURS
• Check wear pads, shims & wear pad fasteners.
Replace as req’d
• Check chains for adequate lubrication.
• Check for corrosion of fasteners.
EVERY 4 YEARS
• Visually inspect extension & retraction ropes.
Disassemble Boom ¹
• Check chains for wear.
Disassemble Boom ¹
• Check cable anchors for corrosion or cracking.
Disassemble Boom ¹
• Clean boom sections and remove internal grease and re-grease with
specified lubricant.
Disassemble Boom ¹
• Sheave pins check for corrosion and wear.
Disassemble Boom ¹
Summary of Contents for 80-160
Page 1: ...OPERATORS MANUAL LOAD KING 80 160 REV B DECEMBER 2020...
Page 2: ...Page Intentionally Blank...
Page 18: ...Page Intentionally Blank...
Page 26: ...26 80 160 Safety 80 160 Safety Sign Locations Right Hand Side View Left Hand Side View...
Page 27: ...27 Rear View Front View...
Page 28: ...28 80 160 Safety Upper Cab...
Page 70: ...70 80 160 Safety Access Egress Rear...
Page 98: ...98 80 160 Assembly...
Page 118: ...118 80 160 Description Of Machine and Controls Lifting controls screen Cab controls screen...
Page 124: ...124 80 160 Description Of Machine and Controls 1 1 PTO Engage Switch...
Page 137: ...137 REPAIRS ADJUSTMENTS REMARKS ITEM REQUIREMENT DATE...
Page 155: ...155 OBSERVE CAUTION NOTES ON OUTRIGGER MOVEMENT WHENEVER SETTING UP OR STOWING OUTRIGGERS...
Page 206: ...Page Intentionally Blank...
Page 209: ...209 8 Install the pin 5 in the guide sheave kickstand 5 9 Remove the lower left hand pin 7 7...
Page 257: ...257 Master Lubrication Chart 13 14 5 4 3 2 2 8 12 9 7 6 15 10 11 BOOM BLOCK TOP VIEW...
Page 300: ...Page Intentionally Blank...
Page 326: ...Page Intentionally Blank...
Page 331: ...331 Repairs Adjustments Remarks Log ITEM REQUIREMENT DATE...
Page 333: ...333...
Page 354: ...Page Intentionally Blank...
Page 362: ...362 80 160 Appendix...
Page 366: ...80 160 Notes...
Page 369: ...80 160 Operator Manual...