
Commissioning and configuration
118
BCL 548
i
Leuze electronic
Connecting functional earth FE
Ensure that the functional earth (FE) is connected correctly.
Unimpaired operation is only guaranteed when the functional earth is connected properly.
All electrical disturbances (EMC couplings) are discharged via the functional earth connec-
tion.
10.3
Starting the device
Connect the supply v10 … 30VDC (typ. +24VDC); the BCL 548
i
starts up and
the bar code reading window appears on the display:
First, you need to assign its individual device name to the BCL 548
i
.
10.4
Configuration steps for a Siemens Simatic S7 control
The following steps are necessary for commissioning with a Siemens S7 control:
1.
Preparing the control system (S7 PLC)
2.
Installing the GSD file
3.
Hardware configuration of the S7 PLC
4.
Transfer of the PROFINET-IO configuration to the IO Controller (S7 PLC)
5.
Device naming
• Configuration of the device name
• Device naming
• Assignment of the device names to the configured IO devices (Figure 10.3...)
• Assignment of MAC address - IP address -individual device name (Figure 10.4)
6.
Check device name
10.4.1
Step 1 – Preparing the control system (S7 PLC)
The first step involves the assignment of an IP address to the IO Controller (PLC - S7) and
the preparation of the control for consistent data transmission.
Notice!
If an S7 control is used, you need to ensure that Simatic-Manager Version 5.4 + service
pack 5 (V5.4+SP5) or higher is used.
By default, parameter enabling is deactivated and you cannot change
any settings. If you wish to carry out the configuration via the display,
you must activate parameter enabling. Further information can be found
in chapter "Parameter enabling" on page 107.
LNK0
LNK1