• All hot-swap drives in the server should have the same throughput speed rating. Using hard disk drives
with different speed ratings will cause all drives to operate at the throughput speed of the slowest drive.
Attention:
To maintain proper system cooling, do not operate the server for more than 10 minutes without
either a drive or a filler panel installed in each bay.
To install a drive in a hot-swap bay, complete the following steps:
Step 1.
Read the safety information that begins in “Safety” on page v and “Installation guidelines” on
page 36.
Step 2.
Touch the static-protective package that contains the drive to any unpainted metal surface on the
server; then, remove the drive from the package and place it on a static-protective surface.
Step 3.
Remove the drive filler panel from one of the empty hot-swap bays.
Step 4.
Install the hard disk drive in the hot-swap bay:
a.
Orient the drive as shown in the illustration.
b.
Make sure that the tray handle is open.
c.
Align the drive assembly with the guide rails in the bay.
00000
00000
00000
00000
00000
0000
0000
0000
Filler panel
Driver-tray
assembly
Drive handle
d.
Gently push the drive assembly into the bay until the drive stops.
e.
Push the tray handle to the closed (locked) position.
f.
If the system is turned on, check the hard disk drive status LED to verify that the hard disk
drive is operating correctly.
Step 5.
Check the drive status LED to verify that the drive is operating correctly. If the yellow drive status
LED for a drive is lit continuously, that drive is faulty and must be replaced. If the green drive
activity LED is flashing, the drive is being accessed.
Note:
If the server is configured for RAID operation using a ServeRAID adapter, you might have to
reconfigure your disk arrays after you install drives. See the ServeRAID adapter documentation for
additional information about RAID operation and complete instructions for using the ServeRAID
adapter.
Step 6.
If you are installing additional hot-swap drives, do so now.
Step 7.
Restart the server. Confirm that it starts correctly and recognizes the newly installed devices, and
make sure that no error LEDs are lit.
Step 8.
Complete the additional steps in “Instructions for Business Partners” on page 27.
If you have other devices to install or remove, do so now. Otherwise, go to “Completing the installation”
on page 87.
50
Lenovo System x3630 M4 Installation and Service Guide
Summary of Contents for System x3630 M4
Page 1: ...Lenovo System x3630 M4 Installation and Service Guide Machine Type 7158 ...
Page 6: ...iv Lenovo System x3630 M4 Installation and Service Guide ...
Page 14: ...xii Lenovo System x3630 M4 Installation and Service Guide ...
Page 108: ...94 Lenovo System x3630 M4 Installation and Service Guide ...
Page 134: ...120 Lenovo System x3630 M4 Installation and Service Guide ...
Page 186: ...172 Lenovo System x3630 M4 Installation and Service Guide ...
Page 844: ...830 Lenovo System x3630 M4 Installation and Service Guide ...
Page 868: ...854 Lenovo System x3630 M4 Installation and Service Guide ...
Page 1026: ...1012 Lenovo System x3630 M4 Installation and Service Guide ...
Page 1030: ...1016 Lenovo System x3630 M4 Installation and Service Guide ...
Page 1038: ...Taiwan BSMI RoHS declaration 1024 Lenovo System x3630 M4 Installation and Service Guide ...
Page 1040: ...1026 Lenovo System x3630 M4 Installation and Service Guide ...
Page 1049: ......
Page 1050: ......