4-1
Chapter 4
Calibration and Programming
Vehicle Controller “Plus 1”
Calibration and Programming
NOTE
Not all rear panel orientations are the same, but the pin
connections used are the same.
Getting Started Using Plus 1 Software
NOTE
Landoll recommends steps 1 thru 3 be completed at the
dealership and not at the customer location. If problems
arise when loading the Plus 1 software, you may need to
consult the factory.
1.
Install the Plus 1 program by following the software
installation instructions provided at Landoll.com.
2.
Attach cable to the available USB computer port
(Part number 150713) and the Kvaser cable (Part
number 151159) to the Steer Column Cable before
starting software.
3.
Start Plus 1 software only.
4.
If steps 1 thru 3 are OK proceed to hook up the
computer interface cable to the forklift with the cable
marked “Vehicle Controller”. See Figures 4-1 and
4-2.
Figure 4-1: Steering Column Connector
Summary of Contents for Bendi B40i4
Page 2: ......
Page 26: ...1 20 F 581 R1 INTRODUCTION SAFETY AND INSPECTION...
Page 100: ...3 52 F 581 R1 TROUBLESHOOTING AND CORRECTIVE MAINTENANCE...
Page 120: ...4 20 F 581 R1 CALIBRATION AND PROGRAMMING...
Page 129: ...ENGINE WITH FUEL SYSTEM 5 9 Figure 5 10 Fuel System Troubleshooting...
Page 133: ...ENGINE WITH FUEL SYSTEM 5 13...
Page 134: ...5 14 F 581 R1 ENGINE WITH FUEL SYSTEM...
Page 140: ...6 2 F 581 R1 GM ENGINE SUPPLIER PROVIDED DOCUMENTATION...