2RG/2RH
2-4-22
F46X
Abnormality detecting of a printer rendering part
1. Exchange boards and perform an operation check.
2. the acquisition wish of USBLOG -- carry out
(Depending on the (2) case, it is print capture data acquisition)
* Only HDD standard model
* F46F is the abnormalities of a printer pro-
cess.
In recurring by specific printer data, please
give me cooperation at acquisition of cap-
ture data and USBLOG.
F47X
F48X
F49X
Abnormality detecting of an image editing pro-
cessing part
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
F4AX
F4CX
Abnormality detecting of a printer rendering part
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
F4DX
Abnormality detecting in the Entity Manage-
ment Department
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
F4FX
Abnormality detecting in the JOB Management
Department
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
Since the USB log immediately after occur-
rence is needed for analysis, please give
me cooperation of acquisition.
F50X
Abnormality detecting in the FAX Management
Department
1. Initialize HDD and perform an operation check.
(FULL of U024) *
2. Carry out U021 Main backup initialization and perform an operation check.
3. Exchange a Main board and perform an operation check.
4. Exchange HDD and perform an operation check.
*
5. Get USBLOG and contact service headquarters.
* Only HDD standard model
Since the USB log immediately after occur-
rence is needed for analysis, please give
me cooperation of acquisition.
No Flash for FAX data
When OFF of the security kit that
replaced the HDD to the SSD.
Number
Contents
Verification procedure & check point
Remarks
Content
Summary of Contents for Copystar CS 3011i
Page 1: ...SERVICE MANUAL Published in September 2016 2RHSM 1 Rev 1 6 3011i 6 3511i ...
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 78: ...2RG 2RH 1 2 51 B B A A B B A A B B A A Tray lower cover Pin Pin ...
Page 83: ...2RG 2RH 1 2 56 This page is intentionally left blank ...
Page 504: ...2RG 2RH 2 2 8 This page is intentionally left blank ...
Page 568: ...Installation Guide DP 7100 Document processor Installation Guide ...
Page 572: ...2 1mm 0mm ն ո պ ջ չ շ A D C B B A ...
Page 573: ...3 ռ ս վ ր ւ ց տ E A ...
Page 574: ...4 ք द I M3x8 փ F G M4x10 K J H A ...
Page 575: ...5 ON ध A ...
Page 577: ...7 շ յ ն ո D E B ...
Page 578: ...8 չ պ F G M4x10 H I M3x8 K J ջ B ...
Page 579: ...9 ռ B ...
Page 589: ...19 ո ն շ պ ջ չ 8 6 7 10 11 9 A B ...
Page 599: ...DP 7110 Document processor Installation Guide ...
Page 603: ...2 շ շ 2 շ 2 շ C M4x14 E ߑ ߒ ߓ ߔ ո շ 2 ߑ ն A ...
Page 604: ...3 ߘ ո ߕ ߗ ո չ պ ջ ߖ F G H M3x8 BLACK A ...
Page 605: ...4 ռ վ ր ւ ց ࠉտ ս I A ...
Page 606: ...5 J L փ ք द K M3x8 K M3x8 K M3x8 ध A ...
Page 607: ...6 ऩ प भ फ ब न म O N A ...
Page 608: ...7 ON य A ...
Page 610: ...9 շ ո շ 2 շ 2 շ 2 ߑ ն շ ߑ ߒ ߓ ߔ C M4x14 E B ...
Page 611: ...10 ߖ ߕ ߘ ߎ չ պ ջ ߗ F G ո H M3x8 BLACK B ...
Page 612: ...11 ռ ս տ ր ց վ I B ...
Page 613: ...12 ւ ք द ध न փ J L P K M3x8 K M3x8 B ...
Page 614: ...13 ऩ प फ O N B ...
Page 634: ...DP 7120 Document processor Installation Guide ...
Page 638: ...2 1mm 0mm ն շ ո չ ջ պ B B A D C A ...
Page 639: ...3 ռ ս վ տ ց ր E A ...
Page 640: ...4 G ւ F F ք փ H ON 10 mm 10 mm A ...
Page 642: ...6 շ ո յ ն D B ...
Page 643: ...7 չ E B ...
Page 644: ...8 F ON G պ F ջ ռ H 10 mm 10 mm B ...
Page 653: ...17 ղ ն շ ճ մ յ 2 6 7 3 4 5 A B ...
Page 655: ...19 չ ջ պ ս վ ռ 9 11 10 13 14 12 10 mm A B ...
Page 665: ...PF 791 500 x 2 Paper feeder Installation Guide ...
Page 673: ...PF 810 3000 sheet deck Installation Guide ...
Page 686: ...DF 791 3000 sheet finisher Installation Guide ...
Page 701: ...DF 7120 1000 sheet finisher Installation Guide ...
Page 705: ...2 մ յ ն 7 7 15 a b a a b b b a A ...
Page 706: ...3 ո շ չ պ A ...
Page 707: ...4 ջ ռ ս c d 14 c d c d 12 c d ջ ռ ս c d 14 c d c d 12 c d A ...
Page 708: ...5 վ ր D ց ON տ A ...
Page 710: ...7 L յ մ ն շ B ...
Page 712: ...9 ս ռ վ տ G B ...
Page 713: ...10 ր ց ւ b a 17 17 25 a b a a b b B ...
Page 714: ...11 ք փ द c d 24 c d c d 22 c d B ...
Page 715: ...12 न ध ऩ प B ...
Page 716: ...13 ब फ ON D B ...
Page 719: ...AK 740 Bridge unit Installation Guide ...
Page 721: ...MT 730 Mailbox Installation Guide ...
Page 736: ...PH 7A C D Punch unit Installation Guide ...
Page 757: ...DT 730 B Document tray Installation Guide ...
Page 759: ...5 2013 5 302LC56750 01 H F G D D 6 4 3 7 E C D D M4 8 M4 8 M4 8 M4 8 ...
Page 760: ...FAX System 12 Installation Guide ...