•
Electrostatic discharge (ESD) grounding wrist strap
•
Flat-blade screwdriver, approximately 1/4 in. (6 mm)
•
Phillips (+) screwdrivers, numbers 1 and 2
RELATED DOCUMENTATION
Return Procedure for the SRX550 Services Gateway | 153
Packing the SRX550 Services Gateway for Shipment | 157
Packing SRX550 Services Gateway Components for Shipment | 158
Packing the SRX550 Services Gateway for Shipment
To pack the SRX550 Services Gateway for shipment:
1. Retrieve the shipping carton and packing materials in which the services gateway was originally shipped.
If you do not have these materials, contact your Juniper Networks representative about approved
packaging materials.
2. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect the strap to the
ESD point on the chassis or to an outside ESD point if the device is disconnected from earth ground.
For more information about ESD, see Preventing Electrostatic Discharge Damage to the SRX550 Services
Gateway.
3. On the console or other management device connected to the services gateway, enter the CLI
operational mode and issue the following command to shut down the services gateway software:
user@host> request system halt
Wait until a message appears on the console confirming that the operating system has halted.
4. Shut down power to the services gateway by pressing the Power button on the front of the services
gateway.
5. Disconnect power from the services gateway.
6. Remove the cables that connect to all external devices.
7. Remove any GPIMs or Mini-PIMs that have been installed in the services gateway.
157
Summary of Contents for SRX550
Page 1: ...SRX550 Services Gateway Hardware Guide Published 2020 12 16...
Page 55: ...39...
Page 178: ...162...
Page 182: ...Restricted Access Warning 166...
Page 196: ...Jewelry Removal Warning 180...
Page 199: ...Operating Temperature Warning 183...
Page 206: ...190...
Page 210: ...194...
Page 213: ...197...