8. If the services gateway is installed in a rack, have one person support the weight of the services gateway
while another person unscrews and removes the mounting screws.
9. Place the services gateway in the shipping carton.
10. Cover the services gateway with an ESD bag, and place the packing foam on top of and around the
device.
11. Replace the accessory box on top of the packing foam.
12. Securely tape the box closed.
13. Write the Return Materials Authorization (RMA) number on the exterior of the box to ensure proper
tracking.
RELATED DOCUMENTATION
Return Procedure for the SRX550 Services Gateway | 153
Packing SRX550 Services Gateway Components for Shipment | 158
Required Tools and Parts for Packing the SRX550 Services Gateway | 156
Packing SRX550 Services Gateway Components for Shipment
Follow these guidelines for packing and shipping individual components of the services gateway:
•
When you return a component, make sure that it is adequately protected with packing materials and
packed so that the pieces are prevented from moving around inside the carton.
•
Use the original shipping materials if they are available.
•
Place the individual component in an electrostatic bag.
•
Write the Return Materials Authorization (RMA) number on the exterior of the box to ensure proper
tracking.
CAUTION:
Do not stack any of the services gateway components during packing.
158
Summary of Contents for SRX550
Page 1: ...SRX550 Services Gateway Hardware Guide Published 2020 12 16...
Page 55: ...39...
Page 178: ...162...
Page 182: ...Restricted Access Warning 166...
Page 196: ...Jewelry Removal Warning 180...
Page 199: ...Operating Temperature Warning 183...
Page 206: ...190...
Page 210: ...194...
Page 213: ...197...