J630D
236
26.7.02
7. Accessories
•
Screw the clamping mechanism into the grinding spindle as far as the limit stop
on the face side.
•
Now unscrew the clamping bolt as far as possible anti-clockwise.
– The ejectors are retracted again.
•
If possible, turn the complete screwed clamping mechanism slightly farther in
the clockwise direction.
•
Tighten the clamping bolt firmly in the clockwise direction.
– Recommendation: Use a socket spanner with a T-shaped grip and a width
across the flats of 5 mm, and tighten the clamping bolt to approximately
20 Nm.
7.7.2
Unclamping the flange from the spindle
•
Loosen the clamping bolt in the anti-clockwise direction as far as the backward
limit stop.
– The clamping pistons are withdrawn and the ejectors are retracted.
•
Unscrew the clamping mechanism anti-clockwise as far as the limit stop.
•
Now hold the grinding wheel firmly and unclamp the locating flange from the
spindle by jerking it anti-clockwise.
•
Unscrew the clamping bolt 1.5 turns clockwise.
– The ejectors are positioned again.
•
Remove the locating flange from the spindle.
7.7.3
Important note: clamping bolt
If you are unable to unclamp the screwed clamping mechanism from the spindle
again because the hexagon socket of the clamping bolt is too worn, you can follow
the procedure described below:
•
Loosen and remove the two countersunk bolts on the end face of the screwed
clamping mechanism.
•
Turn the knurled sleeve 180°.
– The first clamping bolt is now concealed by the sleeve, and the second bolt
is accessible through the hole in it.
•
Screw in the two countersunk bolts again.
– You can now use the second clamping bolt with the intact hexagon socket
instead.
This second clamping bolt has exactly the same function as the first.
The only difference is that it is turned in the opposite direction.
Summary of Contents for J630D
Page 6: ......
Page 7: ...Operating Instructions J630D...
Page 8: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 20: ......
Page 30: ......
Page 34: ......
Page 35: ...J630D 2 Technical data transportation commissioning 26 7 02 29 2 3 Floor space drawing...
Page 36: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 66: ......
Page 80: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 106: ......
Page 114: ......
Page 130: ......
Page 134: ......
Page 136: ......
Page 142: ......
Page 144: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 188: ......
Page 190: ......
Page 198: ......
Page 200: ......
Page 208: ......
Page 210: ......
Page 218: ......
Page 222: ......
Page 226: ......
Page 236: ......
Page 244: ......
Page 246: ......
Page 248: ......
Page 258: ......
Page 262: ......
Page 276: ......
Page 278: ......
Page 286: ...J630D 280 26 7 02 9 Maintenance servicing disposal 9 3 5 Lubrication instruction plate...
Page 290: ......
Page 291: ...J630D 9 Maintenance servicing disposal 26 7 02 285 9 4 Hydraulic plan...
Page 295: ...J630D 9 Maintenance servicing disposal 26 7 02 289 9 5 Pneumatic plan...
Page 296: ......
Page 300: ......
Page 302: ......
Page 304: ......
Page 310: ......
Page 312: ......
Page 314: ......
Page 316: ......