J630D
9. Maintenance / servicing / disposal
26.7.02
299
9.9
Replacing the battery (control unit)
The back-up voltage for the MMC 103 display and the NCU is monitored by the
control unit. If the monitor function is tripped, you must replace the battery within
six weeks.
You should replace the batteries once every two years at the latest for safety re-
asons.
When should the batteries be replaced?
A battery alarm appears on the display.
– Example: "2100 NCU battery voltage low" and the "BAF" LED in the con-
trol cubicle blinks.
– The buffered data is still intact.
•
Do not switch off the control unit until you have replaced the battery.
•
If you ignore the battery alarm, a battery fault will occur within the next six
weeks.
– Example: The message "2102 NCU battery alarm" appears on the display
and the "BAF" LED in the control cubicle lights up.
– The buffered data has been lost and you will have to restart the control unit
after you have replaced the battery.
9.9.1
Replacing the battery for the MMC 103 display
The back-up battery for the MMC 103 display (1) is located at the back of the con-
trol unit.
The door of the control cubicle must be opened and the control unit
switched on in order to replace the battery of the MMC 103 display. It
is therefore only allowed to be replaced by a qualified electrician.
Do not attempt to reactivate a discharged battery either by heating it
or by any other means. This could cause the battery to leak and/or
explode. Failure to comply could result in physical injury or in
damage to property.
If you are unable to acknowledge an error message relating to the
MMC 103 battery, you must not switch off the control unit under any
circumstances. Replace the batteries immediately.
Do not switch off the control unit until you have installed a new bat-
tery. If you do, all the buffered data will be lost and you will have to
re-commission the unit.
Summary of Contents for J630D
Page 6: ......
Page 7: ...Operating Instructions J630D...
Page 8: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 20: ......
Page 30: ......
Page 34: ......
Page 35: ...J630D 2 Technical data transportation commissioning 26 7 02 29 2 3 Floor space drawing...
Page 36: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 66: ......
Page 80: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 106: ......
Page 114: ......
Page 130: ......
Page 134: ......
Page 136: ......
Page 142: ......
Page 144: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 188: ......
Page 190: ......
Page 198: ......
Page 200: ......
Page 208: ......
Page 210: ......
Page 218: ......
Page 222: ......
Page 226: ......
Page 236: ......
Page 244: ......
Page 246: ......
Page 248: ......
Page 258: ......
Page 262: ......
Page 276: ......
Page 278: ......
Page 286: ...J630D 280 26 7 02 9 Maintenance servicing disposal 9 3 5 Lubrication instruction plate...
Page 290: ......
Page 291: ...J630D 9 Maintenance servicing disposal 26 7 02 285 9 4 Hydraulic plan...
Page 295: ...J630D 9 Maintenance servicing disposal 26 7 02 289 9 5 Pneumatic plan...
Page 296: ......
Page 300: ......
Page 302: ......
Page 304: ......
Page 310: ......
Page 312: ......
Page 314: ......
Page 316: ......