5. Functions of the machine
Example: Entering wheel data for face grinding
•
Change B
new
to 23 on the "Parameter grinding wheel" screen.
•
Press the "Actual = new" softkey.
– This causes the "B
new
" value to be copied to "B
act
" and Z1 and Z2 to be set
to 0. The new grinding wheel width (B
new
) is the actual wheel width (B
act
) +
the dressing sum (Z1 + Z2).
•
Now press the "Start change" softkey.
•
Next, set Z1 to 1 and Z2 to 1 in the "Face/path" column on the "Parameter
grinding wheel" screen.
You are now ready to start face pre-dressing.
Always proceed in the order described above!
•
After you have changed the grinding wheel, the SUG confirmation screen
should be displayed. If it is not, please press the "Confirm SUG" softkey
You can only change the grinding wheel actual value Bact by pres-
sing the "Actual = new" softkey.
If you press the "Actual = new" softkey, the dressing sum Z1 + Z2 in
the "Face/path" column is set to 0. You should therefore only do so
in a few specific situations, for example if you are mounting a new
grinding wheel. If you are likely to need the dressing values dis-
played for Z1 and Z2 again later on, you should make a note of them
first so that you can re-enter them subsequently. Otherwise, they will
be lost.
B
act
Z1
Z2
Wheel width B
new
23
+1
+1
= 25
Summary of Contents for J630D
Page 6: ......
Page 7: ...Operating Instructions J630D...
Page 8: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 20: ......
Page 30: ......
Page 34: ......
Page 35: ...J630D 2 Technical data transportation commissioning 26 7 02 29 2 3 Floor space drawing...
Page 36: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 66: ......
Page 80: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 106: ......
Page 114: ......
Page 130: ......
Page 134: ......
Page 136: ......
Page 142: ......
Page 144: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 188: ......
Page 190: ......
Page 198: ......
Page 200: ......
Page 208: ......
Page 210: ......
Page 218: ......
Page 222: ......
Page 226: ......
Page 236: ......
Page 244: ......
Page 246: ......
Page 248: ......
Page 258: ......
Page 262: ......
Page 276: ......
Page 278: ......
Page 286: ...J630D 280 26 7 02 9 Maintenance servicing disposal 9 3 5 Lubrication instruction plate...
Page 290: ......
Page 291: ...J630D 9 Maintenance servicing disposal 26 7 02 285 9 4 Hydraulic plan...
Page 295: ...J630D 9 Maintenance servicing disposal 26 7 02 289 9 5 Pneumatic plan...
Page 296: ......
Page 300: ......
Page 302: ......
Page 304: ......
Page 310: ......
Page 312: ......
Page 314: ......
Page 316: ......