J630D
5. Functions of the machine
26.7.02
159
5.5.14.1
Special multiple plunge grinding program (optional))
This special program combines plunge grinding (either reciprocating plunge grin-
ding or creep-feed grinding) with reciprocating surface grinding and the corres-
ponding dressing cycles. The plunge grinding operation roughs the workpiece and
the reciprocating surface grinding operation finish-grinds it.
Advantages of the program
This special program benefits from the high cutting performance of plunge grin-
ding and the good surface quality of reciprocating surface grinding as well as of-
fering optimum machining times.
General functional description
•
First program step (roughing):
– Depending on the width of the surface to be machined and the effective
width of the grinding wheel, several parallel recesses are plunge-ground in
order to cut as much material as possible within a short period.
•
Second program step (finish-grinding):
– The machined surface is then reground in a reciprocating surface grinding
cycle in order to achieve the optimum surface quality.
You can assign the appropriate dressing technology to each of these program
steps.
Activating special multiple plunge grogram (optional)
•
Press the "Special programs" softkey" in the "Machine Jung" module..
When you set the actual values for grinding (see section 5.4.4
“ISetting actual values for grinding” on page 117) the system auto-
matically activates only the "front" wheel edge.
Please refer to the "Machine Jung" module for the structure of the
function tree (see section 5.1.3 “Function tree structure of the
Machine Jung module in automatic mode” on page 75).
If your machine has two or more special programs, you will now see
a selection screen. When it appears, press the "Multiple plunge
grinding" softkey.
Summary of Contents for J630D
Page 6: ......
Page 7: ...Operating Instructions J630D...
Page 8: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 20: ......
Page 30: ......
Page 34: ......
Page 35: ...J630D 2 Technical data transportation commissioning 26 7 02 29 2 3 Floor space drawing...
Page 36: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 66: ......
Page 80: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 106: ......
Page 114: ......
Page 130: ......
Page 134: ......
Page 136: ......
Page 142: ......
Page 144: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 188: ......
Page 190: ......
Page 198: ......
Page 200: ......
Page 208: ......
Page 210: ......
Page 218: ......
Page 222: ......
Page 226: ......
Page 236: ......
Page 244: ......
Page 246: ......
Page 248: ......
Page 258: ......
Page 262: ......
Page 276: ......
Page 278: ......
Page 286: ...J630D 280 26 7 02 9 Maintenance servicing disposal 9 3 5 Lubrication instruction plate...
Page 290: ......
Page 291: ...J630D 9 Maintenance servicing disposal 26 7 02 285 9 4 Hydraulic plan...
Page 295: ...J630D 9 Maintenance servicing disposal 26 7 02 289 9 5 Pneumatic plan...
Page 296: ......
Page 300: ......
Page 302: ......
Page 304: ......
Page 310: ......
Page 312: ......
Page 314: ......
Page 316: ......