J630D
206
26.7.02
6. Dressers
6.8.2
Installation and commissioning
6.8.3
Calculating the basic dimension on the PA 31K
•
Position the turret head close to the limit positions in the U+ and W+ axes.
•
Insert the dividing head into the turret head with the single-diamond holder
mounted on it, then tighten it.
– The calibrated ball insert enclosed with the dresser has already been com-
pletely adjusted in the factory.
•
Press the "Adj. diam. NC start" softkey; the diamond swivels about the radius
midpoint in the E-axis.
•
Check this motion for deviations using a dial gauge.
•
If the gauge indicates a deviation, you must correct it by means of the single-
diamond holder.
– If it is not possible to adjust the single-diamond holder so that it is exactly
concentric, the calibrated ball insert is misaligned. You must first preset it to
the reference dimension (47.5 -0.1 - -0.2) and then adjust the length exactly.
•
Now swivel the dividing head 2 x 90° by pressing the "Diamond ch. NC start"
softkey twice.
•
Then tighten the fastening screws more firmly and repeat the measurement.
The machine is only allowed to be installed, commissioned and
connected to the mechanical components of the PA 31K by the Jung
Customer Service department. K.Jung GmbH cannot under any
circumstances accept liability for damage resulting from failure to
comply and no warranty claims will be allowed.
Summary of Contents for J630D
Page 6: ......
Page 7: ...Operating Instructions J630D...
Page 8: ......
Page 12: ......
Page 14: ......
Page 18: ......
Page 20: ......
Page 30: ......
Page 34: ......
Page 35: ...J630D 2 Technical data transportation commissioning 26 7 02 29 2 3 Floor space drawing...
Page 36: ......
Page 38: ......
Page 46: ......
Page 48: ......
Page 56: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 66: ......
Page 80: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 100: ......
Page 106: ......
Page 114: ......
Page 130: ......
Page 134: ......
Page 136: ......
Page 142: ......
Page 144: ......
Page 148: ......
Page 154: ......
Page 158: ......
Page 160: ......
Page 172: ......
Page 188: ......
Page 190: ......
Page 198: ......
Page 200: ......
Page 208: ......
Page 210: ......
Page 218: ......
Page 222: ......
Page 226: ......
Page 236: ......
Page 244: ......
Page 246: ......
Page 248: ......
Page 258: ......
Page 262: ......
Page 276: ......
Page 278: ......
Page 286: ...J630D 280 26 7 02 9 Maintenance servicing disposal 9 3 5 Lubrication instruction plate...
Page 290: ......
Page 291: ...J630D 9 Maintenance servicing disposal 26 7 02 285 9 4 Hydraulic plan...
Page 295: ...J630D 9 Maintenance servicing disposal 26 7 02 289 9 5 Pneumatic plan...
Page 296: ......
Page 300: ......
Page 302: ......
Page 304: ......
Page 310: ......
Page 312: ......
Page 314: ......
Page 316: ......