INTRODUCTION
PRELIMINAR STUDIES AND CONSIDERATIONS
MAINTENANCE AND DAMAGE PREVENTION
WORK ON BASIC VEHICLE
MOUNTING AND CONSTRUCTION
POWER TAKE-OFF
ELECTRIC AND ELECTRONIC SYSTEMS
APPENDIX
V1.0, February 2015
Body Builder Manual Part II, Specific Book LCV
225
Below is a diagram clearly indicating the arrangement of connections available for
additional electricity consumers:
Table 1-163 LCV_SPBTC73_001 Connections for additional electricity consumers
DIAGRAM OF CONNECTIONS FOR ADDITIONAL ELECTRICITY CONSUMERS
Fuse capacity
Maximum Power
Remark
1
Terminal 150 A
12 V/105 A
B+
2
Terminal 10 A
12 V/6 A
Engine run
3
Terminal 25 A
12 V/17 A
B+
4
Terminal 15 A
12 V/10A
Ignition 2
A
Main battery
G
Starter
B
Seat fuse box
H
DCU
C
Auxiliary fuse box
J
Seat fuse box
D
Auxiliary battery
K
Engine run relay
E
Body Builders Block Junction
M
IG2 relay
F
Power cut relay
NOTICE
If the Body Builders block junction installed from factory is not free, and if the
Auxiliary Block Junction is also occupied because of special equipment, it is pos
-
sible to connect the additional electricity consumers to the positive terminal of the
battery. In this case, a Block Junction should also be installed to protect the sys
-
tem.