INTRODUCTION
PRELIMINAR STUDIES AND CONSIDERATIONS
MAINTENANCE AND DAMAGE PREVENTION
WORK ON BASIC VEHICLE
MOUNTING AND CONSTRUCTION
POWER TAKE-OFF
ELECTRIC AND ELECTRONIC SYSTEMS
APPENDIX
200
Body Builder Manual Part II, Specific Book LCV
V1.0, February 2015
6
POWER TAKE-OFF
This chapter provides the following information:
- General considerations
- Study of different types of PTOs