Reserve the following clearances around the cabinet to facilitate operations and
ventilation:
●
Reserve a clearance of at least 950 mm from the front of the cabinet for
ventilation and operations.
●
Reserve a clearance of at least 500 mm from the top of the cabinet for
operations.
●
Reserve a clearance of at least 500 mm from the rear of the cabinet for
ventilation.
–
Reserve a clearance of at least 800 mm if you need to perform operations
at the rear of the cabinet.
–
If the top air-flow cabinet is configured, no space needs to be reserved at
the rear.
Figure 6-11 Space planning for standard configuration (1200 kVA)
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
87