Figure 6-266 Tightening the anchor bolts
d. Reinstall the power distribution cover and bottom cover.
Step 5 Install the removed side panel on the side of the top air-flow cabinet.
Step 6 Install anchor baffle plates on the side and front of each cabinet.
Figure 6-267 Installing anchor baffle plates
Step 7 Install the parallel copper bars.
Figure 6-268 Installing screws on parallel battery and output copper bars
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)