Figure 6-109 Installing signal cables
(1) Power cable hole
(2) Signal cable hole
Step 4 Install battery cables.
NO TE
The figure uses the cable connection between the UPS and the SmartLi as an example.
Battery cables are connected to each SmartLi.
Figure 6-110 Installing power cables between the UPS and the SmartLi
(1) Connect the ground cable of the battery string or its BBB box to the battery PE of the UPS
or the ground bar in the equipment room based on the site survey.
Step 5 Install top supports and covers of the battery terminal protective covers.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
150