3. Combine the inductor cabinet with other cabinets in the sequence of bottom
and middle, reinstall the rear door panel of the inductor cabinet, and install
the removed side panel to the side of the inductor cabinet.
NO TE
There are sheet metal stiffeners at the bottom of the inductor cabinet. After the pallet
is removed, the pallet truck cannot transport the inductor cabinet from the front.
Therefore, reserve space on the side of the inductor cabinet or use other
transportation methods.
Figure 6-117 Installing the connecting kits and reinstalling the rear door
panel and side panel
Step 5 Secure the cabinets.
Figure 6-118 Securing the cabinets
NO TE
To meet the requirements of 9-intensity earthquake resistance, tighten 24 screws at the
bottom.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
155