Figure 6-74 Connecting a signal cable between the UPS and the SmartLi (only for
SmartLi 2.0)
(1) Monitoring interface unit in the master SmartLi cabinet
Step 11 Install top frames.
Figure 6-75 Installing top frames
Step 12 Install the front and rear mounting plates.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
130