Figure 6-33 Drilling holes and installing expansion sleeves
(1) M12 bolt
(2) Spring washer
(3) Flat washer
(4) Expansion sleeve
(5) Expansion nut
(6) Concrete floor
Step 3 Move the cabinets to the installation positions.
Step 4 Secure the cabinets.
Figure 6-34 Securing the cabinets
NO TE
To meet the requirements of 9-intensity earthquake resistance, tighten 16 screws at the
bottom.
Step 5 Install anchor baffle plates.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)