Figure 6-162 Installing signal cables
(1) Power cable hole in the inductor cabinet
(2) Signal cable hole in the inductor cabinet
(3) Power cable hole in the bottom cabling
cabinet
(4) Signal cable hole in the bottom cabling
cabinet
Step 9 Install mains input power cables.
Figure 6-163 Installing mains input power cables
Step 10 Install bypass input and output power cables.
●
Two power sources
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
181