Figure 6-152 Removing the covers and battery copper bars
Step 2 Install epoxy boards (No. 1 to 8).
Figure 6-153 Installing epoxy boards
Step 3 Install batteries (No. 33 to 36) and mains input copper bars (No. 28 to 32 and 40)
from right to left.
UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Modules)
6 Installation
Issue 05 (2021-10-13)
Copyright © Huawei Technologies Co., Ltd.
175