FRU Removal and Replacement
223
Removing and Replacing FRUs
This section describes procedures to remove and replace director FRUs, along
with a list of tools required to perform each procedure. In addition, the section
provides:
■
ESD information.
■
A list of concurrent FRUs.
■
A list of non-concurrent FRUs.
See Chapter 5, ““
” on page 263” for FRU locations
and part numbers.
ESD Information
When performing procedures described in this section, follow all ESD
procedures, WARNING statements, and CAUTION statements.
Caution:
To avoid causing machine errors or damage while working on the
director, follow ESD procedures by connecting a grounding cable to the
director chassis and wearing an ESD wrist strap.
The ESD grounding points for the front of the chassis (
1
) are located at the right
and left sides of the chassis, as shown in
. Touch the chassis once before
performing any maintenance action, and once each minute while removing or
replacing FRUs. If the director is not connected to facility power (and therefore
not grounded), connect the ESD wrist strap to an approved bench grounding point
instead of the chassis. The ESD grounding point for the rear of the chassis (
1
) is
located next to the maintenance port, as shown in
. Touch the chassis
once before performing any maintenance action, and once each minute while
removing or replacing FRUs.
Summary of Contents for StorageWorks 2/140 - Director Switch
Page 18: ...About this Guide 18 Director 2 140 Service Manual ...
Page 160: ...Diagnostics 160 Director 2 140 Service Manual ...
Page 262: ...FRU Removal and Replacement 262 Director 2 140 Service Manual ...
Page 270: ...Illustrated Parts Breakdown 270 Director 2 140 Service Manual ...
Page 318: ...Information and Error Messages 318 Error Messages ...
Page 388: ...Event Code Tables 388 Director 2 140 Service Manual ...