Maintenance
Electrical contact densimeter threshold inspection
GE Information
08- 2016
L51- 108EN/06
6/8
Replacing the densimeter
Process
The table below gives the process to replace the densimeter:
Step
Action
Diagram
1
Disconnect the pipe (12)
from the valve (24) of the
connection valve block (5).
Screw the valve- cap (25) on
the valve (24).
25
12
5
24
2
Remove the densimeter (1),
held in place by screws (14),
on the connection valve
block (5).
x3
14
H M6-20
5
1
3
Remove
the
connection
valve block (5), held in place
by screws (8), on the housing
cover (2) of the circuit-
breaker.
NOTE
: If the connection
valve block (5) is any
more used, see the next
paragraph “Putting away
the control tool”.
x3
8
H M6-20
2
5
4
Install new seals (26) and
(27) on the densimeter (1),
referring to
“Preparing and
installing static seals”
in
”Erection general proced-
ures”.
Install the densimeter (1) on
the housing cover (2), of the
circuit- breaker,
using
screws (8).
x3
8
H M6-20
0,7 daN.m
26
1
2
27
Summary of Contents for SF6
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 299: ...GE Information This page is intentionally blank...
Page 300: ......