Installation
Checking for presence of nitrogen (N
2
)
in pole parts
GE Information
08- 2016
L31- 064EN/05
2/4
Checking for presence of N
2
gas in columns
Opening the case of
the columns
Remove only the cover of the case
. Remove packaging protection
,
to
free the housing (7) of the column.
NOTE
: Keep the packaging protection
,
for later utilization.
7
Visual inspection
of the column
Begin visual inspection to check the condition of ceramic envelopes. Make
sure that their enamel has not been chipped or in any way damaged during
transportation.
Continued on next page.
Summary of Contents for SF6
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 299: ...GE Information This page is intentionally blank...
Page 300: ......