Installation
Coupling of column and chambers
GE Information
L31- 7138EN/02
5/16
11- 2016
Hoisting and preparing the breaking chamber
Raising the breaking
chambers
Using two slings, lift the chambers and
LEVEL THEM
, the casing (2) should
be at head height (approximate weight: 700 kg).
2
Assembling the
centring pins
Fit parts A, B & C to the centring pins (30) & (31) without locking them in place
so that they may be easily removed later on.
NOTE
: Pin (31) is longer than pin (30).
30
A
B
C
31
Depressurizing
the chambers
S
Remove the cap (5) from the transport cover (4) and operate the valve (6)
to re- establish atmospheric pressure within the chambers.
REMINDER
: transport pressure nitrogen: azote (N
2
) at 0.03 MPa at 205C
(101.3 kPa).
S
Refit the cap (5).
5
6
4
Continued on next page.
Summary of Contents for SF6
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 299: ...GE Information This page is intentionally blank...
Page 300: ......