Installation
Installation of operating device
GE Information
L31- 7902EN/02
11/12
11- 2016
Low voltage electrical wiring
Process
Connect up the operating device’s wires refer to the wiring diagram of the cir-
cuit- breaker.
Connect up the operating device’s wires.
NOTE
: Use the holes provided on the supports of the frame to fix
the cables.
Connecting up the
contact densimeter
cable
Connect the wires from the electrical contact SF
6
densimeter (18) cable (19)
to the operating mechanism terminal block, in accordance with the relative
diagram.
18
19
Summary of Contents for SF6
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 299: ...GE Information This page is intentionally blank...
Page 300: ......