Commissioning
Pre- commissioning inspections
GE Information
L34- 011EN/09
3/6
10- 2016
Orientation and identification of interrupting chambers
Inspection
Check that the interruption chambers are disposed correctly, the bosses (B1)
and (B2) must be situated on the same side as the operating mechanism (3).
Rule
When facing bosses (B1) and (B2) :
- chamber ”
1
” is on the
left
,
- chamber ”
2
” is on the
right
.
Diagram
B2
3
B1