Installation
Coupling of column and chambers
GE Information
L31- 7138EN/02
8/16
11- 2016
Final coupling,
continued
Removing the
chamber transport
cover
The table below shows the steps for removing the chamber transport cover:
Step
Action
Illustration
6
Fit the trolley stop (34) and fix
in place using the bolts (40)
recovered from the transport
cover, hand tightening them.
x 2
H M16- 55
34
40
7
Prepare the fitting tool (35)
by screwing the coupling pin
(24) onto its end, hand tight-
ening.
35
24