Commissioning
Pre- commissioning inspections
GE Information
L34- 011EN/09
5/6
10- 2016
Operating device
Measurements
Note the supply voltage of motors on the operating mechanism terminals.
Inspection
Check that the following items are working correctly :
- heating,
- lighting (where applicable),
- connections on terminals (no excessive tightening).