Installation
Pre- filling with SF
6
gas at 0.05 MPa
GE Information
L31- 960EN/04
1/4
02- 2017
Presentation
Principle
The pre- filling of the pole with SF
6
gas at 0.05 MPa must be done
after the
vacuum operation
.
NOTE
: You are reminded that the gas used to fill the pole must
conform to the requirements laid out in IEC 60376.
Necessary equipment
and tools
List of the necessary Grid Solutions equipment and tools for the pre- filling
with SF
6
gas :
Mark
Diagram
Designation
Number
(4)
Filling tool
1
(10)
Pressure reducer
1
(8)
SF
6
gas bottle(s)
*
* depending on the aparatus.
In this module
This module contains the following topics:
Topic
Page
Preparing the SF
6
gas bottle
2
Pre- filling with SF
6
gas
3
Summary of Contents for SF6
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 299: ...GE Information This page is intentionally blank...
Page 300: ......