Maintenance
Electrical contact densimeter threshold inspection
GE Information
08- 2016
L51- 108EN/06
7/8
Putting away the control tool
Process
The table below gives the steps of putting away the control tool:
Step
Action
Diagram
1
Take
precautions
to
remove the seal (16) from
the connection valve block
(5) and put it away into the
“SET OF SEALS” box of
the densimeter threshold
inspection case.
16
5
2
Install screws (14) on the
connection valve block (5)
Put away the connection
valve block (5) into the
case.
x3
14
H M6-20
5
3
Disconnect the pipe (23)
from the valve (10) of the
gauge (11).
SF
6
10
11
23
Summary of Contents for SF6
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 299: ...GE Information This page is intentionally blank...
Page 300: ......