Installation
Installation of operating device
GE Information
L31- 7902EN/02
3/12
11- 2016
Preparing the pole operating shaft
Introduction
For transport the pole is fitted with a securing tool (4) and a safety plate (5),
temporarily attached to the end of the handle (12)
To fit the operating lever, you must:
a - Remove the securing tool (4).
b -
Manually open the pole.
c - Refit the securing tool (4) (“open” position).
d - Remove the safety plate (5).
4
5
12
5
7
Grease
Check the presence of grease (ASEOL 0- 365.2) on the pole operating shaft.
Continued on next page.
Summary of Contents for SF6
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 299: ...GE Information This page is intentionally blank...
Page 300: ......