Maintenance
Electrical contact densimeter threshold inspection
GE Information
08- 2016
L51- 108EN/06
5/8
Densimeter threshold inspection, continued
Testing
The table below gives the steps of densimeter testing:
Step
Action
Comment
1
Connect a test lamp to the
“Alarm pressure for the insu-
lation”
p
ae
densimeter
threshold.
Connection to the terminal block of
the operating mechanism in
accordance with the electrical dia-
gram.
2
Calculate the effective pres-
sure at which the
“Alarm
pressure for the insula-
tion”
p
ae
contact switches
over - corrected in keeping
with temperature and local
atmospheric pressure.
Value p
ae
: see technical charac-
teristics).
See the module
“Calculation of
the SF
6
gas filling pressure to
using the pressure gauge
(tool)”.
3
D
Create a leak by unscrewing
the “REGULATION” screw (20) -
of the gauge (11) -, making sure
that the contact switches over at
the previously calculated value.
D
Proceed in the same way to
check the contact of “Minimal
pressure for the insulation” p
me
.
11
20
If one of the thresholds does not
comply with the specified value,
replace the densimeter.
Summary of Contents for SF6
Page 206: ...Grid Solutions This page is intentionally blank...
Page 212: ...Grid Solutions This page is intentionally blank...
Page 216: ...Grid Solutions This page is intentionally blank...
Page 220: ...Grid Solutions This page is intentionally blank...
Page 299: ...GE Information This page is intentionally blank...
Page 300: ......