
•
If the detectors are cold due to an A1 Power Panel (breaker) being off, turn the system on
and wait two hours before performing a tube warmup. This allows the detectors to return to
operating temperature.
1. Clear the gantry area of all objects. Any obstruction in the gantry may lead to artifacts in
scanned images.
2. From the image monitor, click the
Utilities
icon
.
3. From the
Utilities
menu, click
Daily Prep
, then
Tube Warmup
.
The
Service-Calibration Tools
window opens.
4. Select
Tube Warmup
from the drop-down and click [Run].
5.
Alternatively, click
, then [Tube Warmup].
NOTE:
Refer to the
Safety
chapter regarding using non-GE tubes.
6. Press <Start Scan>.
7. The system returns to the
Service-Calibration Tools
window when the tube warmup is
complete. Click [Dismiss] to exit the window.
Revolution CT User Manual
Direction 5480385-1EN, Revision 1
Chapter 9 Startup and Shutdown
201