Software Procedures
SW 004 (A+,A,B) Dome Video Board Driver Installation
Page 196
d.
Select the appropriate number of screens.
e.
Select the correct monitor orientation (side by side or left/right). A set of icons will display
showing the number of monitors and their respective orientation. The monitor layout is self
explanatory. A 4A will have the 4x1 configuration depicted with 4 portrait monitors across by
1 monitor high.
f.
Select (check on)
Pedestal
.
g.
Ensure that
Sync on Green
and
Composite Sync
are NOT checked.
h.
Ensure that
Disabled Direct Draw
and
Disable Red & Blue
are NOT checked.
i.
Click
OK
to make the changes permanent.
j.
Click
OK
to test the new settings.
k.
Click
OK
to accept the new settings or wait 15 seconds and
OK
will be selected
automatically.
l.
Click
Yes
to reboot the workstation.
17.
The VGA service monitor is no longer required and may be powered off and removed from the
workstation.
Summary of Contents for Centricity RA600
Page 16: ...Introduction Page 16 Illustration 1 2 Computer Unit Front View ...
Page 24: ...Introduction Page 24 Modality Type Description IP Address S M GW Port AE Title ...
Page 206: ...Software Procedures SW 006 Single Media Archive SMA Install Configure Test Page 206 ...
Page 274: ...Renewal Parts Page 274 Jorge Aguirre med ge com Maurice Robert med ge com ...