Hardware Installation
IST 001 (A+) 2048 x 2506 Portrait Monitor Interconnections
Page 30
Table 3-1: Items used for installation of 2048 x 2506 workstation
The Centricity RA600 Workstation should already be configured as per the factory settings. Also, the
operating system software and applications software are installed at the factory. The person
installing the workstation must physically interconnect workstation cables, and then configure the
system using site-specific information (i.e. IP address).
3-2 Line Voltage Selection
Line voltage selection is automatic for the workstation, monitors and most of the peripherals.
3-3 Power Connections
Power cables must be fitted with proper plugs for the country where the workstation is installed. A
distribution strip is supplied with the system.
3-4 Network Connection
The ethernet network connections are made via hubs or switches.
Cable Part
No.
From
To
Cable Detail
N/A
CPU
Keyboard
Integrated Keyboard Cable
N/A
CPU
Network
10/100 BaseT Patch Cable
4363099
CPU - Video Board.
Monitor Cable
Monitor Cable to CPU
N/A
CPU
Mouse
Integrated Mouse Cable
4363149
CPU
Power Outlet
Power Connection, USA
4363149
Monitor(s)
Power Outlet
Power Connection, USA
N/A
CPU VGA port
VGA Monitor
Service Monitor Tool
Summary of Contents for Centricity RA600
Page 16: ...Introduction Page 16 Illustration 1 2 Computer Unit Front View ...
Page 24: ...Introduction Page 24 Modality Type Description IP Address S M GW Port AE Title ...
Page 206: ...Software Procedures SW 006 Single Media Archive SMA Install Configure Test Page 206 ...
Page 274: ...Renewal Parts Page 274 Jorge Aguirre med ge com Maurice Robert med ge com ...