4-9
4. Loosen locking nuts on top of stud ends of main and safety cables.
5. Remove holding nuts on bottom of stud ends of main and safety cables.
6. Remove cable studs from carriage cable mounting strut.
7. Push ball end of follower cable out of slot in carriage cable mounting strut.
8. Move carriage toward top of column until ball end of follower cable is exposed.
Move ball end of cable to bottom of column.
9. Remove follower cable from lower pulley and leave inside bottom of column.
10. Remove pulley and brake assembly. Refer to Section 4-5.
11. Remove counterweight from top end of column. Refer to Section 4-7.
At this point all three cables are detached from the counterweight and can be
removed from the vertical columnassembly.
12. Remove main, safety and follower cables.
Summary of Contents for AMX 4+
Page 1: ...0 0 1 1 2 2...
Page 2: ......
Page 3: ...D D D D D D D D D D D D D D D D...
Page 4: ...D D D D D D D D...
Page 6: ...iv...
Page 8: ...vi...
Page 14: ...xii...
Page 18: ...xvi...
Page 32: ...1 14...
Page 48: ...3 14...
Page 84: ...5 10...
Page 106: ...7 12...
Page 112: ...8 6...
Page 116: ...9 4...
Page 131: ......
Page 132: ...3 2 2 1 0 3 5 0 2 0 4 0 2...