REV 5
DIRECTION 2173225-100
4-2
8. Remove trim cover from bottom of vertical column by removingthree screws, two
clip nuts and two bindinghead screws. See Illustration 4-1.
9. Remove 5 bearingplate screws and washers securingcolumn to the column supĆ
port base.
10. Remove two screws securingbrake cable cover and disconnect the lower brake
connectors. See Illustration 4-2.
11. Move brake cable connectors and cover away from column support base.
12. Break loose the column support bearingfrom the column support base by jacking
the column out usingthree 1/4-20 screws thru the base plate and against the supĆ
port base.
13. Lift the column and bearingplate out of the base.
14. Lower the column onto the floor or a table capable of supportingits weight. CarĆ
riage side must be upwards.
15. Remove the chain hoist and liftingtool.
ILLUSTRATION 4-2
BUSHING
BEARING PLATE SCREW (5)
FLAT WASHER(5)
COVER
BUSHING
LIFTING TOOL
VERTICAL COLUMN
BRAKE CABLE
(2)
MOUNTING SCREWS
OR NUTS
COLUMN SUPPORT
BASE
LOWER BRAKE
CONNECTOR
DIODE
Summary of Contents for AMX 4+
Page 1: ...0 0 1 1 2 2...
Page 2: ......
Page 3: ...D D D D D D D D D D D D D D D D...
Page 4: ...D D D D D D D D...
Page 6: ...iv...
Page 8: ...vi...
Page 14: ...xii...
Page 18: ...xvi...
Page 32: ...1 14...
Page 48: ...3 14...
Page 84: ...5 10...
Page 106: ...7 12...
Page 112: ...8 6...
Page 116: ...9 4...
Page 131: ......
Page 132: ...3 2 2 1 0 3 5 0 2 0 4 0 2...