AP-6
APPX. 3 DIGITAL INTERFACE
Digital Interface
<Input sentences
>
ABK, ACN (ACM), ALC, ALF, ALR, ARC, CUR, DBT, DDC, DPT, DTM, GGA, GLL, GNS, HBT,
HCR, HDT, MTW, MWD, MWV, NRM, NRX, NSR, RMC, RRT, SRP, THS, VBW, VDM, VDO,
VDR, VHW, VLW, VSD, VTG, ZDA
<Output sentences>
ABM, ALC, ALF, ALR, ARC, BBM, DDC, EVE, HBT, OSD, RRT, RSD, RTE, SRP, TLB, TTD,
TTM, VSD, WPL
Note:
When this radar system has Back-up ECDIS enabled and Back-up ECDIS mode is active,
the talker for some route-related sentences and alerts changes to "EI".
<Transmission interval>
25 s for HBT
<Data reception>
Data is received in serial asynchronous form in accordance with the standard referenced in IEC
61162-2 or IEC 61162-1 Ed.5.
The following parameters are used:
Baud rate: 38,400 bps (HDT, THS, !AIVDM, !AIVDO, !AIABK, $AIALR). The baud rate of all other
sentences is 4800 bps
Data bits: 8 (D7 = 0), Parity: none, Stop bits: 1
Data Sentences
<Input sentences>
ABK - UAIS Addressed and binary broadcast acknowledgment
D0 D1 D2 D3 D4 D5 D6 D7
Data bits
Start
bit
Stop
bit
$--ABK,xxxxxxxxx,x,x.x,x,x,*hh<CR><LF>
1 2 3 4 5
1. MMSI of the addressed AIS unit (9 digits)
2. AIS channel of reception (No use)
3. Message ID (6, 8, 12, 14)
4. Message sequence number (0 to 9)
5. Type of acknowledgement (See below)
0 = Message (6 or 12) successfully received by the addressed AIS unit
1 = Message (6 or 12) was broadcast, but not ACK by addressed AIS unit
2 = message could not be broadcast (quantity of encapsulated data exceeds five slots)
3 = requested broadcast of message (8, 14 or 15) has been successfully completed
4 = late reception of message (7 or 13) ACK that was addressed to this AIS unit (own ship and referenced a valid
transaction)
5 = message has been read and acknowledged on a display unit.
Summary of Contents for FAR 3220
Page 201: ...D 1 31 Aug 2022 H MAKI...
Page 202: ...D 2 31 Aug 2022 H MAKI...
Page 203: ...D 3 31 Aug 2022 H MAKI...
Page 204: ...D 4 31 Aug 2022 H MAKI...
Page 205: ...D 5 13 May 2020 H MAKI...
Page 206: ...D 6 13 May 2020 H MAKI...
Page 207: ...D 7 13 May 2020 H MAKI...
Page 208: ...D 8 13 May 2020 H MAKI...
Page 209: ...D 9 31 Aug 2022 H MAKI...
Page 210: ...D 10 31 Aug 2022 H MAKI...
Page 211: ...D 11 13 May 2020 H MAKI...
Page 212: ...D 12 13 May 2020 H MAKI...
Page 213: ...D 13 29 Nov 2017 H MAKI...
Page 214: ...D 14 29 Nov 2017 H MAKI...
Page 215: ...24 Mar 2014 H MAKI D 15...
Page 216: ...24 Mar 2014 H MAKI D 16...
Page 217: ...D 17 8 Jun 2018 H MAKI...
Page 218: ...D 18 8 Jun 2018 H MAKI...
Page 219: ...D 19 8 Jun 2018 H MAKI...
Page 220: ...D 20 11 Jan 2018 H MAKI...
Page 221: ...D 21 11 Jan 2018 H MAKI...
Page 222: ...D 22 11 Jan 2018 H MAKI...
Page 223: ...D 23 11 Jan 2018 H MAKI...
Page 224: ...D 24 11 Jan 2018 H MAKI...
Page 225: ...D 25 11 Jan 2018 H MAKI...
Page 226: ...D 26 14 Jun 2018 H MAKI...
Page 227: ...D 27 14 Jun 2018 H MAKI...
Page 228: ...D 28 14 Jun 2018 H MAKI...
Page 229: ...D 29 28 Feb 2018 H MAKI...
Page 230: ...D 30 8 Jun 2018 H MAKI...
Page 231: ...D 31 13 Jan 2012 Y NISHIYAMA...
Page 232: ...D 32 13 Jan 2012 Y NISHIYAMA...
Page 233: ...D 33 13 Jan 2012 Y NISHIYAMA...
Page 234: ...D 34 13 Jan 2012 Y NISHIYAMA...
Page 235: ...D 35 6 Feb 2020 H MAKI...
Page 236: ...D 36 25 Mar 2021 H MAKI...