
C122-E001-10EN
C-19
C.3 Powering On and Powering Off Partitions
3
To turn off a partition, select [Power Off] for it in the [Power Control] column,
and click the [Apply] button.
The partition is turned off.
Notes: For the reason described below, the operation for shutting down a
partition must be performed from the OS.
When the [Power Off] operation is selected, and the OS supports ACPI,
the OS can be shut down and the power to a partition can be turned off by
the power-off operation described above. However, if the OS does not
support ACPI, this operation turns the power off without shutting the OS
down.
Even if the OS supports ACPI, power may not be turned off if an
application running under the OS does not support it. This depends on the
OS and application specifications. For details, see the OS and application
manuals.
Summary of Contents for PRIMEQUEST 400 Series
Page 1: ...C122 E001 10EN Front Cover INSTALLATION MANUAL ...
Page 2: ......
Page 18: ...x C122 E001 10EN NOTE ON SAFETY Extended Power Cabinet ...
Page 19: ...C122 E001 10EN xi NOTE ON SAFETY Extended I O Cabinet ...
Page 20: ...xii C122 E001 10EN NOTE ON SAFETY PCI_Box ...
Page 21: ...C122 E001 10EN xiii NOTE ON SAFETY PRIMEQUEST 520A 520 420 Main unit ...
Page 22: ......
Page 24: ......
Page 42: ......
Page 46: ......
Page 122: ......
Page 186: ......
Page 354: ......
Page 356: ......
Page 394: ......
Page 428: ......
Page 445: ......
Page 446: ...Back Cover ...