C.1.1.1 Power-on procedure using circuit breakers (PRIMEQUEST
580A/540A/580/540/480/440)
Note on power-on
Switch on the circuit breakers from the base cabinet.
Unless all circuit breakers are switched on, the system may not start normally because
of insufficient PSU power supply. Switch on all circuit breakers in quick succession.
Remarks: When switching off and on a main line switch, wait at least 10 seconds
after switching it off before switching it on again.
If the circuit breaker is switched off because an overcurrent was detected, a problem
such as a short circuit occurred in the main unit. If the circuit breaker is switched on
again under this condition, the circuit breaker on the distribution panel may be
switched off and a burnout may occur in the main unit. To prevent this problem, do
not switch on the circuit breaker again, and call a certified service engineer.
Power-on procedure
1
Switch on the circuit breakers on the main unit.
Open the rear door of the base cabinet, and set the all breaker switches near the
top of the cabinet to the | side.
Figure C.1 Circuit breaker locations (base cabinet)
Breaker switch
Summary of Contents for PRIMEQUEST 400 Series
Page 1: ...C122 E001 10EN Front Cover INSTALLATION MANUAL ...
Page 2: ......
Page 18: ...x C122 E001 10EN NOTE ON SAFETY Extended Power Cabinet ...
Page 19: ...C122 E001 10EN xi NOTE ON SAFETY Extended I O Cabinet ...
Page 20: ...xii C122 E001 10EN NOTE ON SAFETY PCI_Box ...
Page 21: ...C122 E001 10EN xiii NOTE ON SAFETY PRIMEQUEST 520A 520 420 Main unit ...
Page 22: ......
Page 24: ......
Page 42: ......
Page 46: ......
Page 122: ......
Page 186: ......
Page 354: ......
Page 356: ......
Page 394: ......
Page 428: ......
Page 445: ......
Page 446: ...Back Cover ...