![Fujitsu AB* A12GATH Service Manual Download Page 14](http://html.mh-extra.com/html/fujitsu/ab-a12gath/ab-a12gath_service-manual_117995014.webp)
01-09
Check Item
Check contents
Judgement
Present Status
Ref. circuit name _______________________, Ref. address ________(00 99)
Power
Source
Outdoor Unit
Actual Power Supply (V)
Between R-S / S-T / T-R
< 3, 4Wire + ground, 50Hz >
AC (380 - 415V)
10%
Incoming voltage per breaker
Master (V): R-S:_____ / S-T:____ / T-R:____
Slave -1 (V): R-S:_____ / S-T:____ / T-R:____
Slave -2 (V): R-S:_____ / S-T:____ / T-R:____
Indoor Unit
Actual Power Supply (V)
< 1, 2Wire + ground, 50Hz >
Incoming voltage per breaker
Breaker-1 (V):
_______
Breaker-2 (V):
_______
Breaker-3 (V):
_______
_______
Check Contents
Judgement
Present Status
Ref. circuit name ________________________, Ref. address ________(00 99)
For each
refrigerant
system
Outdoor unit
Check PCB- Lighting status
Master
LED101 (green light)
Judgment : must be ON
Yes / No
Note : LED102 (Red) must not be flash & must not be ON
7-SEG LED
Judgment : ‘Sn’ displayed
Yes / No
LED101: Yes No
7-SEG : Yes No
Slave-1
LED101: Yes No
7-SEG : Yes No
Slave-2
LED101: Yes No
7-SEG : Yes No
Indoor unit
Check LED & RC display status
IU address _______
IU address _______
IU address _______
IU address _______
IU address _______
IU address _______
IU address _______
IU address _______
IU address _______
IU address _______
IU address _______
Indoor Unit
For Wall mounted, Universal, Celling & Small Cassette
Check IU operation LED & timer LED condition
Judgment : must be flashing alternately Yes / No
For Large Cassette and Duct type IU
Check Wired RC (3-wire) display screen
Judgment : Clock display “AM 12:00” will appear
Yes / No
Check Wired RC (2-wire) display screen
Judgment : Language selection screen will appear
Yes / No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
AC (220 - 240V)
10%
Overview of system operation check procedure
Step-1
: Connect Service Tool PC to the VRF V-III system.
Do scaning of refrigerant system which should be commissioned.
Step-2
: Compare the number of installed units (OU
and IU) with the System List data obtained from the Service Tool.
Step-3
: Operate all Indoor Units under Test Mode Cooling (Select Test mode either cool or heat based on ambient temperature.).
Step-3-1: During operation, check the IU thermistor value
Step-3-2: After 1-hour operation, check the Refrigerant System
Step-4
: After 1-hour Test run operation (excluding special operation),
Step-4-1: Switching the operation mode of IU
from cool to heat.
- Check the IU thermistor value
Step-4-2: When all IUs run under heating, continue operation minimum 15min. And check the Refrigerant system
1-3-2 Error indication check sheet
1-3 Check Items After Power ON
1-3-1 Power source check sheet
Summary of Contents for AB* A12GATH
Page 5: ...1 TEST RUN ...
Page 28: ...2 OUTDOOR UNIT OPERATION CONTROL ...
Page 52: ...3 INDOOR UNIT OPERATION ...
Page 75: ...4 TROUBLE SHOOTING ...
Page 203: ...5 APPENDING DATA UNIT ...
Page 210: ...05 07 LOW STATIC PRESSURE DUCT TYPE MODEL ARXB24GALH ARXB30GALH ARXB36GALH MODEL ARXB45GALH ...
Page 213: ...05 10 MODEL ARXC36GBTH MODELS ARXC72GBTH ARXC90GBTH ...
Page 214: ...FLOOR CEILING TYPE MODELS AB A12GATH AB A14GATH AB A18GATH AB A24GATH 05 11 ...
Page 215: ...CEILING TYPE MODELS AB A30GATH AB A36GATH AB A45GATH AB A54GATH 05 12 ...
Page 217: ...05 14 WALL MOUNTED TYPE MODELS AS A04GACH AS A07GA H AS A09GA H AS A12GA H AS A14GA H ...
Page 218: ...05 15 MODELS AS A18GA H AS A24GA H AS A30GA H ...
Page 219: ...05 16 MODEL ARXH054GTAH OUTDOOR AIR UNIT MODEL ARXH072GTAH ...
Page 220: ...05 17 MODEL ARXH096GTAH ...
Page 221: ...MODELS AJ 072LALBH AJ 090LALBH AJ 072LATBH AJ 090LATBH 05 18 5 2 2 Outdoor Unit ...
Page 225: ...6 DISASSEMBLY PROCESS ...
Page 226: ......