Summit X450a Series Switches
Summit Family Switches Hardware Installation Guide
443
Input current
1.0 A @ 115 V
(low-line)
0.5 A @ 230 V
(high-line)
Line frequency range
47 to 63 Hz
Inrush current
30 A @ 115 V, 60 A @ 230 V
Power supply cord type
AC
Power supply input socket
IEC 320 C14
Power cord input plug
IEC 320 C13
Power cord wall plug
Refer to
“Power Cord Requirements for AC-Powered Switches and AC
Power Supplies” on page 500
.
Power supply cord gauge
18 AWG (0.75 mm
2
) up to 6 feet or 2 meters
or
16 AWG (1.0 mm
2
) over 6 feet
Efficiency
80% with 60% to 100% load
Heat dissipation
100 W (341.2 BTU/hr)
Power consumption
100 W (341.2 BTU/hr)
Summit X450a-24tDC Power
Operational voltage range
–36 to –72 V
Nominal input ratings
–48 V
, 2.0 A
Nominal input current
2.0 A @ -36 V
(low-line)
1.0 A @ -72 V
(high-line)
Inrush current
20 A @ 48 V, 30 A @ 72 V
Power supply cord type
DC
Power supply input socket
TYCO PN 206061-1
Power cord input plug
TYCO PN 206060-1
Power cord wall plug
None provided
Power supply cord gauge
14 AWG (2.0 mm
2
)
Heat dissipation, Watts, BTU
75 W, 255.9 BTU/hr
Power consumption, Watts, BTU
75 W, 255.9 BTU/hr
Summit X450a-48t Power
Operational voltage range
90 to 264 V
Nominal input ratings
100 to 240 V
, 50/60 Hz, 1.5 A
Nominal input current
1.45 A @ 115 V
(low-line)
0.65 A @ 230 V
(high-line)
Line frequency range
47 to 63 Hz
Inrush current
30 A @ 115 V, 60 A @ 230 V
Power supply cord type
AC
Power supply input socket
IEC 320 C14
Power cord input plug
IEC 320 C13
Power cord wall plug
Refer to
“Power Cord Requirements for AC-Powered Switches and AC
Power Supplies” on page 500
.
Power supply cord gauge
18 AWG (0.75 mm
2
) up to 6 feet or 2 meters
or
16 AWG (1.0 mm
2
) over 6 feet
Efficiency
80% with 60% to 100% load
Table 86: Summit X450a Series Switch Technical Specifications (Continued)
Summary of Contents for Summit X150 Series
Page 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Page 15: ...PA R T About the Summit Family Switches...
Page 16: ......
Page 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Page 173: ...PA R T Installing the Hardware...
Page 174: ......
Page 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Page 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Page 339: ...PA R T Maintenance Procedures...
Page 340: ......
Page 399: ...PA R T Appendices...
Page 400: ......
Page 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Page 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Page 512: ...Index Summit Family Switches Hardware Installation Guide 512...