Chapter 7: Installing Summit External Power Supplies
Summit Family Switches Hardware Installation Guide
328
Figure 271: EPS-C2 Connector Selector Switch
After the EPS-C2 has been installed in a rack and the power supplies have been installed, do the
following to connect the redundant power cables:
1
Set the connector selection switch for either the 2X9 or 2X7 connectors.
2
Connect the keyed end (for the 2x7 connector cable, the end with the tab offset from the edge of the
connector pins) of the redundant power cord to the EPS-C2 chassis (see
Figure 272
). Verify that the
side of the connector marked TOP is facing up.
3
Connect the other end of the redundant power cable (for the 2x7 connector cable, the end with the
key flush with the edge of the connector pins) to the Summit switch (see
Figure 272
). Be sure that the
side of the connector marked TOP is facing up.
Figure 272: Installing the Redundant Power Cord
4
Repeat steps
2
and
3
to connect any additional redundant power cords.
Connecting the AC Power cord to the EPS-C2
After the redundant power cord is connected between the EPS-C2 and the switch, and an AC power
cord to the internal power supply of the switch is attached to a power source (see
Chapter 6, “Installing
Summit Family Switches.”
), install the AC power cord to the power supplies in the EPS-C2 as follows:
ESP-C2_01a
Connector selector switch
2
x9 Output
2
x7 Output
Power Configur
a
tion Sele
c
tor
EPS-C2
ESP-C2_02
! See M
a
nu
a
l
Redund
a
nt Power
put
Out
! See M
a
nu
a
l
Redund
a
nt Power
put
Out
! See M
a
nu
a
l
Redund
a
nt Power
put
Out
! See M
a
nu
a
l
Redund
a
nt Power
put
Out
! See M
a
nu
a
l
Redund
a
nt Power
put
Out
! See M
a
nu
a
l
Redund
a
nt Power Output
Connect First
! See Manual
! See Manual
Summary of Contents for Summit X150 Series
Page 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Page 15: ...PA R T About the Summit Family Switches...
Page 16: ......
Page 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Page 173: ...PA R T Installing the Hardware...
Page 174: ......
Page 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Page 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Page 339: ...PA R T Maintenance Procedures...
Page 340: ......
Page 399: ...PA R T Appendices...
Page 400: ......
Page 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Page 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Page 512: ...Index Summit Family Switches Hardware Installation Guide 512...