Chapter 7: Installing Summit External Power Supplies
Summit Family Switches Hardware Installation Guide
324
Figure 266: Sliding the EPS-C2 into the Rack and Securing it
Installing a Summit 750 W AC Power Supply into the EPS-C2
The EPS-C2 chassis is shipped with slots 2 and 3 covered and slot 1 open. Extreme Networks
recommends that you install a power supply first in slot 1, but this is not required. You can install
power supplies into any of the slots in the EPS-C2 chassis. The installation sequence does not affect the
performance of the power supply units, but empty slots must be covered at all times.
WARNING!
To prevent an electrical hazard, make sure that the AC power cord is not connected to the power supply
before you install the power supply in the power supply bay.
EPS_CS
2
10
Summary of Contents for Summit X150 Series
Page 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Page 15: ...PA R T About the Summit Family Switches...
Page 16: ......
Page 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Page 173: ...PA R T Installing the Hardware...
Page 174: ......
Page 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Page 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Page 339: ...PA R T Maintenance Procedures...
Page 340: ......
Page 399: ...PA R T Appendices...
Page 400: ......
Page 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Page 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Page 512: ...Index Summit Family Switches Hardware Installation Guide 512...