Installing Cable
When you connect cable to your network equipment:
●
Examine cable for cuts, bends, and nicks.
●
Support cable using a cable manager that is mounted above connectors to avoid unnecessary weight
on the cable bundles.
●
Use cable managers to route cable bundles to the left and right of the network equipment to
maximize accessibility to the connectors.
●
Provide enough slack, approximately 2 to 3 inches (5.08 to 7.62 cm), to provide proper strain relief as
shown in
Figure 137 on page 183
.
●
Bundle cable using hook-and-loop straps to avoid injuring cables.
●
If you build your own cable, be sure that connectors are properly crimped.
●
When installing a patch panel using twisted pair wiring, untwist no more than 1 inch (2.54 cm) of
the cable to avoid radio frequency (RF) interference.
●
Discharge the RJ-45 Ethernet cable before plugging it into a port on the switch.
CAUTION
Unshielded twisted pair (UTP) cable can build up ESD charges when being pulled into a new
installation. Before connecting any category 5 UTP cable to the switch, discharge ESD from the cable by
plugging the RJ-45 connector into a LAN static discharge device or use an equivalent method.
●
Use plenum-rated cable when it is necessary for safety and fire rating requirements. Consult your
local building codes to determine when it is appropriate to use plenum-rated cable, or refer to IEC
standard 850.
●
Keep all ports and connectors free of dust.
Summary of Contents for Summit X150 Series
Page 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Page 15: ...PA R T About the Summit Family Switches...
Page 16: ......
Page 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Page 173: ...PA R T Installing the Hardware...
Page 174: ......
Page 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Page 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Page 339: ...PA R T Maintenance Procedures...
Page 340: ......
Page 399: ...PA R T Appendices...
Page 400: ......
Page 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Page 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Page 512: ...Index Summit Family Switches Hardware Installation Guide 512...