Chapter 7: Installing Summit External Power Supplies
Summit Family Switches Hardware Installation Guide
322
Installing an EPS-C2 Chassis
Install one, two, or three Summit 750 W AC power supplies (model 10931) in the EPS-C2 chassis
(model 10936) to build an external redundant power system for one or more compatible Summit
switches. One redundant power cable is shipped with the EPS-C2 chassis to provide the connection
between the external power system and the redundant power input connector on the back of a Summit
X440 series switch. Additional redundant power cables are available from Extreme Networks.
When installing an EPS-C2 chassis at the same time as a Summit switch, install the components in the
following order:
1
Install Switch into rack.
2
Install EPS-C2 chassis into rack.
3
Install power supplies into the EPS-C2 chassis.
4
Attach redundant power cable from EPS-C2 chassis to switch.
5
Attach AC power cord to internal power supply of switch, and then plug into AC power source.
6
Install AC power cords to internal power supplies of the EPS-C2 chassis, and then plug power cords
into AC power source.
WARNING!
Be sure to attach power to components in the order listed in this section. If you attach power out of the
order listed, you can damage your equipment.
The following sections describe the specific steps for installing the EPS-C2 chassis.
NOTE
An AC power cord is not provided with the Summit 750 W AC power supply. See
“Selecting Power Supply
Cords” on page 405
for information about selecting a power cord.
Summary of Contents for Summit X150 Series
Page 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Page 15: ...PA R T About the Summit Family Switches...
Page 16: ......
Page 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Page 173: ...PA R T Installing the Hardware...
Page 174: ......
Page 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Page 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Page 339: ...PA R T Maintenance Procedures...
Page 340: ......
Page 399: ...PA R T Appendices...
Page 400: ......
Page 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Page 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Page 512: ...Index Summit Family Switches Hardware Installation Guide 512...