Chapter 9: Replacing AC Power Supplies in Summit Family Switches
Summit Family Switches Hardware Installation Guide
348
6
Carefully slide the power supply all the way into the power supply bay (
Figure 289
). Push the power
supply in until the latch snaps into place.
Figure 289: Installing a Summit 750 W AC Power Supply
CAUTION
Do not slam the power supply into the switch.
7
If necessary, slide the plastic cord retainer farther away from the back of the switch (
Figure 290
).
Figure 290: Moving the Power Cord Retainer
SH_205
SH_227
Summary of Contents for Summit X150 Series
Page 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Page 15: ...PA R T About the Summit Family Switches...
Page 16: ......
Page 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Page 173: ...PA R T Installing the Hardware...
Page 174: ......
Page 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Page 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Page 339: ...PA R T Maintenance Procedures...
Page 340: ......
Page 399: ...PA R T Appendices...
Page 400: ......
Page 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Page 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Page 512: ...Index Summit Family Switches Hardware Installation Guide 512...