Chapter 6: Installing Summit Family Switches
Summit Family Switches Hardware Installation Guide
266
To install a Summit 450 W or 550 W AC power supply:
1
Attach an ESD-preventive wrist strap to your bare wrist and connect the metal end to an appropriate
grounding point.
2
If you are installing the power supply in a Summit X670 series switch:
a
Verify that the switch chassis has been grounded (see step
6 on page 293
).
b
Verify that the airflow direction for the power supply is the same as the airflow direction of the
installed fan modules in the switch.
3
If necessary, remove a blank panel from the back of the Summit X480 or X670 series switch
(
Figure 212
).
Figure 212: Removing a Blank Panel
4
Verify that the power supply is right side up, with the latching tab at the left of the unit (see
Figure 213
).
5
Carefully slide the power supply all the way into the power supply bay (see
Figure 213
). Push the
power supply in until the latch snaps into place.
CAUTION
Do not slam the power supply into the switch.
Figure 213: Installing a Power Supply
SH_137
SH_138
Summary of Contents for Summit X150 Series
Page 14: ...Preface Summit Family Switches Hardware Installation Guide 14...
Page 15: ...PA R T About the Summit Family Switches...
Page 16: ......
Page 156: ...Chapter 2 Summit Power Supplies Summit Family Switches Hardware Installation Guide 156...
Page 173: ...PA R T Installing the Hardware...
Page 174: ......
Page 190: ...Chapter 4 Site Preparation Summit Family Switches Hardware Installation Guide 190...
Page 338: ...Chapter 8 Installing Optional Ports Summit Family Switches Hardware Installation Guide 338...
Page 339: ...PA R T Maintenance Procedures...
Page 340: ......
Page 399: ...PA R T Appendices...
Page 400: ......
Page 503: ...Japan VCCI Class A Summit Family Switches Hardware Installation Guide 503...
Page 504: ...Appendix B Technical Specifications Summit Family Switches Hardware Installation Guide 504...
Page 512: ...Index Summit Family Switches Hardware Installation Guide 512...